• Pendidikan dan pengajaran
  • Penelitian dan pengembangan
  • Pengabdian pada masyarakat

 Kategori
 Detail view full text

ANALISIS SISTEM PERAWATAN PERALATAN PRODUKSI PT. COCA COLA PAN JAVA

1073533 bytes

Irwan Sukendar,, Nuzulia Khoiriyah,,

Abstrak

        PT. Coca Cola is a big company that have big production facility and many production machines to do its daily production activity. The problem will be happened if there are down time because of machine faillure. So that the production activity must be stopped. And just will be continue after the machine be maintained. And because of it, the company can’t often get the target of production planning. With the our research, we know that at production line l, 2, 3 and 4 have main time Before failure (MTBF) 13,89 hours, 5,05 hours, 17,54 hours, and 12,82 hours. The optimum total cost is 75 at time interval 36,5 – 45,5 minutes and 95 qt time interval 104,5 – 123,5 minutes.

        Kata kunci: Down time, Production Machine

Item Type: 
Subjects: 
Divisions: 
Deposited By: 
Deposited On: 
Last Modified: 
Article
-
Fakultas Teknologi Industri > Jurusan Teknik Industri
Irwan Sukendar,
00 0000, 00:00:00
00 0000, 00:00:00
Sultan Agung Islamic University | Scientific Publications Repository is developed by the Information System Bureau of Sultan Agung Islamic University
View My Stats